Solar Thermal Energy Plant

>This solar energy plant is located 20+ miles outside of
Nevada Solar One is Nevada's first solar power plantLas Vegas in the Eldorado Valley south of Boulder
and is located a few miles outside if Las Vegas. It isCity, NV. If you are driving from Vegas, take Hwy 95
designed on solar thermal principles as opposed tosouth, drive through Boulder City following the signs
photovoltaics.and just a stone throw outside of town take the exit
Solar energy can be produced in a number of ways.to "Searchlight." Within a mile or two you should see
There is the familiar solar panel - they are becomingthe 350 acre solar energy plant on the right-hand side.
increasingly common as they become more and moreAs of writing this article (June of 2007), it is not
affordable. Solar panels produce solar energy throughoperational yet. It appears that there is still quite a bit
the process called photovoltaics: the rays of the Sunof construction is to be done. When complete, it will
hit the silicon crystals in the panel thus inducing a flowgenerate enough power through solar energy to
of electrons. Another way to extract energy formsatisfy the needs of 60 thousand of homes. The
sunlight is the solar thermal process.  drawback is that power generated this way is still
Solar thermal energy is gathered by the use ofabout three times more expensive than if a coal-fired
parabolic mirrors. The mirrors are positioned to faceplant was used.
the Sun, and a clear tube is placed at the focal pointA major advantage of generating solar energy this
where a liquid flowing through the tube is heated. Next,way as opposed to the use of solar panels is that it
the pipes are run through a boiler where the the steamis quite low-tech compared to photovoltaics. The silicon
generated spins the generators creating electricity. Thiscrystals needed to generate a flow of electricity when
step is not unlike what one might see in a traditionalit is hit by sunlight are formed by baking the compound
coal-fired plant. All in all, it is a fairly simple and low-techin an oven then allowed to slowly cool to form the
process as far as the technical requirements forcrystals. It requires specialty equipment, which is quite
designing and building such a plant is concerned. expensive. Even with larger production volumes, solar
There aren't too many of these plants around theenergy through photovoltaics is quite a bit more
world. One was built at the end of the 70's inexpensive than conventional power. Solar thermal
response of the oil shortage and it is located in thepower faces the same problem. However
California desert only hours from Nevada Solarthe technology requirements are low, economics of
One.    scale should more easily close the gap.